![]() TF Thunderbird assists in clearing through maneuver box clean-up, Materiel Turn-in and Account Closure, and Rail Up-load/Barge Roll-on and Commercial Line-haul Operations, and shipment of personnel and equipment to Home Station facilities. (4) Phase V: Redeployment (24 May – 3 Jun). (4) Phase IV: Recovery Operations: This phase begins when the BCT vacates the ISB and moves into the maneuver box with the recovery of the ISB and continues throughout the redeployment phase. It continues as the 33st ASG operates the ISB at Camp Gruber, Oklahoma from D-7 until D+3. Initial duties include the following: (a) Sign for facilities (b) Open accounts (c) Begin drawing supplies and equipment at Ft Chaffee and the ISB. This phase begins when advance party from the 33st ASG, as well as advanced parties from the Joint State Task Force, Oklahoma (JSTF). (2) Phase II: Intermediate Staging Base Operations and Live Fire Exercise (1 May – 19 May). This phase encompasses all aspects of soldier/equipment preparation, planning and coordination at unit home station, and the successful movement of all rotational soldiers and equipment to Camp Gruber, Oklahoma and Ft Chaffee, Arkansas. UNCLASSIFIED ADMIN/LOGO #1, dtd 24 Jul 00 (1) Phase I: Pre-Deployment/Deployment Phase (Present to 13 May). This operation is divided into the following five phases: The primary focus of the JSTF will be the establishment and operation of an Intermediate Staging Base (ISB) at Camp Gruber, Oklahoma for the 45th Bde Thunderbird provide rear operations for the 45th Bde TF Thunderbird at Ft Chaffee, Arkansas operate the Joint Visitors Bureau (JVB) maintain “real world” personnel and medical status and coordinate all “real world” activities prior to, during, and after the period 12. ![]() Army and Air National Guard units, under the direction of the Joint State Task Force (JSTF), will support the 45th Infantry Brigade (Separate) “Thunderbird” Task Force (TF) during Rehearsal Annual Training (REHAT) scheduled for 12. ![]() UNCLASSIFIED ADMIN/LOGO #1, dtd 24 Jul 00 JSTF (-)/DISCOM FWD HQ STARC – OK 645 PSC D1/B/2/135 Avn(UH1) C 205 ASMB 1245 TC 1345 TC D1/105 MPAD 767 En(FFTm) 139 PA (b) BLUE AIR (ANG) (c) Logistical Support Area (LSA) 33rd ASG 45 RTOC HHD 345 CSB HQ STARC - IL 136 QM Bn 1120 Maint(-) 120 Eng(-) 933 MP Co 2133 TC 1115 TC 133 Sig Bn(Plt) (d) Medical Task Force 338 Med Grp 339 Hosp 296 Med(-) D1/812 Avn C 205 ASMB 2. (1) 45th Infantry Brigade (SEPARATE) TF THUNDERBIRD 45th SIB HVY TM 7th ID 108th Avn Bn(UH60) A 1/149 Atk(AH64) H 185 Atk(AH58D) D1/1/149 Avn(CH47) D/245 Avn E/245 Avn 133 Sig Bn(Co) 122 ASOS 125 AWF 134 IN Det(LRSD) (2) ISB Operations 33rd ASG 45 RTOC HHD 2 QM 1120 Maint(-) 933 MP Co 1345 TC(-) 547 TC(-) (3) Fort Chaffee Operations UNCLASSIFIED The building boasts a unique all glass elevator system and massive interior sub-basement vehicle turntable to accommodate trucks and deliveries servicing the facility.UNCLASSIFIED Joint State Task Force “Okie” Oklahoma City, OK 241200R Jul 00 ADMINISTRATIVE/LOGISTICS ORDER NO 1 RELATED OPERATIONS: 45th Infantry Brigade Rehearsal Annual Training (REHAT), 12-, STARC-OK References: Maps, Highway, OK, AR, Time Zone Used Throughout the Order: ROMEO 1. The Concourse level features an inlaid marble rosette at its center. In addition to offices for State agencies, the building is also home to three floors of restaurants and shops, and 13 floors of balconies that surround the 160-foot high rotunda. Visitors to the Thompson Center's interior can see all 17 floors layered part way around the building's immense skylit atrium. The 17-story, all-glass exterior curves and slopes facing its plaza on the southeast corner of the property, across from the Daley Center and Chicago’s City Hall. It was designed by architect, Helmut Jahn. It sits on an entire city block bordered by Lake Street, LaSalle, Randolph and Clark Streets in the heart of downtown Chicago.Ĭommissioned by the State of Illinois and Governor Thompson at the time, the glass and steel structure’s open floor plan and massive open atrium are intended to be architectural metaphors for transparency and open government in action. Opened in May 1985 as the State of Illinois Center, the building was renamed in 1993 to honor former Illinois Governor James R.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |